No results were found for the filtering!
BSC Load disconnection LA-1 €49.31 *
Ready for shipment immediately, delivery time approx. 1-3 working days
BSC Tandem load cut-off LA-TR €166.53 *
Ready for shipment immediately, delivery time approx. 1-3 working days
BSC Ventilation power supply LA-2 €166.53 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Sale
ACTION
Aumüller m-com main control element €45.62 *
Ready for shipment immediately, delivery time approx. 1-3 working days
BSC Load disconnection LA-SYN €415.82 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Sale
ACTION
Aumüller control module USKM (up to max. 300mm stroke) €183.79 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Load cut-offs are electronic modules that ensure that drives switch off correctly when they are blocked or have reached the end position. If several drives are to be switched off simultaneously and in front of each other, tandem switch-offs are used. And if several drives are to run at exactly the same speed, so-called synchronous controls are required. We have written a detailed blog article on this topic