Product finder
Step by step to the right product

>> To our product consultants

Printable checklists
Send in and receive offer

>> To the checklists

Load disconnections and synchronous controls

Load disconnections and synchronous controlsLoad cut-offs are electronic modules that ensure that drives switch off correctly when they are blocked or have reached the end position. If several drives are to be switched off simultaneously and in front of each other, tandem switch-offs are used. And if several drives are to run at exactly the same speed, so-called synchronous controls are required. We have written a detailed blog article on this topic Click here.

Actuators and switch-off electronics must fit together, so it is best to stay with the same manufacturer (actuators and electronics).

Load cut-offs are electronic modules that ensure that drives switch off correctly when they are blocked or have reached the end position. If several drives are to be switched off simultaneously... learn more »
Close window
Load disconnections and synchronous controls

Load disconnections and synchronous controlsLoad cut-offs are electronic modules that ensure that drives switch off correctly when they are blocked or have reached the end position. If several drives are to be switched off simultaneously and in front of each other, tandem switch-offs are used. And if several drives are to run at exactly the same speed, so-called synchronous controls are required. We have written a detailed blog article on this topic Click here.

Actuators and switch-off electronics must fit together, so it is best to stay with the same manufacturer (actuators and electronics).

Filter
1 from 4
Close filter
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
No results were found for the filtering!
BSC Lastabschaltung LA-1 BSC Load disconnection LA-1
€49.31 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Tandem-Lastabschaltung LA-TR BSC Tandem load cut-off LA-TR
€166.53 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Lüftungsnetzteil LA-2 BSC Ventilation power supply LA-2
€166.53 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Aumüller m-com Hauptkontrollelement Aumüller m-com main control element
€47.01 *
Ready for shipment immediately, delivery time approx. 1-3 working days
BSC Lastabschaltung LA-SYN BSC Load disconnection LA-SYN
€415.82 *
Ready for shipment immediately, delivery time approx. 1-3 working days
Lüftungsnetzteil LA-4 BSC Ventilation power supply LA-4
€481.84 *
Delivery time 16 - 19 Working days
Aumüller Kontrollmodul USKM (bis max. 300mm Hub) Aumüller control module USKM (up to max. 300mm stroke)
€189.45 *
Ready for shipment immediately, delivery time approx. 1-3 working days
STG Beikirch Schließfolgesteuerung ESF STG Beikirch closing sequence control ESF
€324.19 *
Delivery time 9 - 12 Working days
STG Beikirch Schließfolgesteuerung ESFT (Tandem) STG Beikirch closing sequence control ESFT (Tandem)
€324.19 *
Delivery time 9 - 12 Working days
STG Beikirch Synchronmodul SM3 1,0A/1,0A/A STG Beikirch synchronous module SM3 1.0A/1.0A/A
€350.49 *
Delivery time 9 - 12 Working days
STG Beikirch Synchronmodul SM3 1,0A/1,0A/B STG Beikirch synchronous module SM3 1.0A/1.0A/B
€350.49 *
Delivery time 26 - 29 Working days
STG Beikirch Synchronmodul SM3 1,0A/1,0A/C Kingspan STG synchronous module SM3 1.0A/1.0A/C
€350.49 *
Delivery time 41 - 44 Working days
1 from 4
Last viewed